Project
Chiquola
Avenue Bridge Replacement
Client
Town
of Honea Path
Honea Path, South Carolina
Scope
Preliminary
design, final design, bidding, and construction administration services
to dismantle and dispose of an existing timber bridge structure over
abandoned railroad right-of-way and construction of an earthen
embankment in place of the bridge.
Demolition and disposal included existing road surface, curb and
gutter, and concrete sidewalk. Regrading
of the bridge approaches and realigning the intersection of Railroad
Street and Chiquola Avenue was required.
The project included construction of new asphalt roadway,
concrete curb and gutter, and concrete sidewalk. Also included was
construction of a section of 8 inch waterline within the project limits,
installation of metal guardrail along the newly constructed embankment,
and grassing of disturbed areas following construction.
Cost
$135,000
Completed
June 1995 |